Plan outdoor glass from the structure upwards
We have completed balustrade work in Wetherby, including the kind of outdoor projects where the visible deck or patio is only part of the story. The support beneath must be suitable for the glass, fixings and intended guarding role.
For decking, we need to understand the framework and edge detail rather than relying on the boards alone. Patio and external projects bring their own questions about base materials, drainage and weather exposure. Send photos and approximate dimensions so we can review the shape, provide a free quote and identify what should be checked during a later measuring visit.


Prepare access before measuring and installation
Once you proceed, we can arrange a planned measure in Wetherby to confirm corners, levels, fixing positions and bespoke panel sizes. We also review how the glass will reach the deck, patio or raised garden area.
Customers can help by clearing furniture, pots and planting from the relevant structure. If building work is under way, the support and final edge layout should be ready at the agreed stage. We then plan delivery and fitting around exposure and the chosen fixing system. This avoids measuring against temporary boards or surfaces that move before the glass arrives.
Frequently asked questions
Do decking boards provide enough fixing support?
Boards alone are not normally the structural basis we need to assess. The supporting framework, edge details and available connection points must be understood before a system is specified.
Can you design around an exposed patio edge?
Yes, subject to suitable fixing conditions. We review the base, edge distances, drainage and weather exposure before proposing the glass and support arrangement.
What should be complete before final measurement?
The supporting structure and agreed fixing surfaces should be stable and accessible. Temporary finishes or incomplete edges can lead to dimensions changing after glass has been ordered.